Surrey Close // Playground Consultation

The Tenant and Leaseholder Services have highlighted some playgrounds that need improving in Thanet. The playgrounds will undergo consultation from local residents in that area.

Our first focus is: Surrey Close playground in Ramsgate. 

This will be a two step process: 

Stage 1 - Consult residents on whether we should refurbish or remove the playground.

If the decision is to refurbish, it will move on to the next stage. 

Stage 2 - Consult residents on design options of the playground 


The outcome of the consultations will influence our decision

You're viewing real-time data. Participant counts are continuously updated for administrators. Please note that regular users see cached data, which may result in slight differences in the numbers.
5 participants

Phases

Phases overview
Phase 1: Stage One: Collecting your views
Stage One: Collecting your views
Phase 2: Stage One: Results and feedback
Stage One: Results and feedback
Phase 4: Stage Two: Choose your favourite design
Stage Two: Choose your favourite design
Phase 5: Stage Two: Review feedback
Stage Two: Review feedback
Phase 6: Stage two: Results and feedback
Stage two: Results and feedback
Phase 7: Update - Installation of new playground equipment
Update - Installation of new playground equipment

Stage two: Results and feedback

21 January 2025 00:00 - 7 November 2025 00:00

Overall the favourite design was Option 2

Great news, the playground design with the most votes was Option 2.


50% of those that took part in the survey, chose Option 2 as their favourite. 

44% liked Option 3 and 6% liked Option 1. 


Residents told us they wanted inclusive play equipment and disabled access.

An inclusive swing will be added to the Option 2 final design of the playground to create a more accessible and diverse space for children. 


Residents Voice

The following feedback represents the sentiment of the majority of comments.


Feedback on Option 1 

Residents liked the nest swing and slide.


Feedback on Option 2 

Residents liked the mixed ability aspect, but mentioned there were not any inclusive options. 


Feedback on Option 3

Residents liked the mixed ability and the inclusion of inclusive equipment for less abled children.


Next Steps: 

  • We have started the process of finding a suitable contractor to refurbish the playground and install Option 2 with an addition of an inclusive swing.
  • We anticipate work to start Spring/Summer 2025. 